» Power generation / Petrochemical industry Heavy wall tubes and pipes by using ”TIG/GTAW cold wire process” |
Competition is always increasing, schedules are always shorter, therefore companies must choose the most effective welding procedures taking into account: - required quality and productivity - environmental conditions - qualifications of personnel - competitivity
|
 |
» Pipeline laying Large productivity gains and increased flexibility | Reduced arc time, reduced weld metal volume, increased productivity, better mechanical properties, reproducible and traceable quality. |  |
|